ERDC TN-DOER-C27
July 2002
Table C14
Alternative 1: Hydraulic Dredging and Conventional Disposal in an Existing
CDF, Engineering Costs
Engineering Costs, Alternative 1
Dura-
tion
Total
tons/
yr
cy/yr
Total $
$/yr
Cost Item
$/ton
$/cy
tons
yr
Total cy
Hyd Dredging Cost1
$4
0
775,000
2
387,500
$3,100,000
$1,550,000
1
$7
0
0
$0
Mech Dredging Cost
Mob/Demob
0
2
0
$1,000,000
$500,000
Separation1
$15
0
0
$0
Separation/Dewatering1
$25
0
0
$0
Transportation2
$110
0
0
$0
Disposal2
$50
0
0
$0
Revenues from sale
1
0
0
$0
$4,100,000
$2,050,000
Total:
CDF Construction
$6
0
$0
Capping
$2
619,830
$1,239,660
1,800,000
1
Based on in situ volumes or weights.
2
Based on processed volumes or weights.
Available Storage Capacity (cy)
1,800,000
Storage Capacity Consumed (cy)
1,399,016
Remaining Storage Capacity (cy)
400,984
Table C15
Alternative 1: Hydraulic Dredging and Conventional Disposal in an Existing
CDF, Financial Costs (Interest Rate = 0.06375)
2001
2002
2003
Cubic Yards
0
112,500
112,500
$/yr
$2,050,000
$2,050,000
IDC (interest during construction)
$0
$269,706
$130,688
Cost/Year
$0
$2,319,706
$2,180,688
Total Financial Investment:
$4,500,394
CDF Construction included here if completely precedes dredging.
CDF and first-year dredging included here if they will both occur in the first year.
30
|
Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing |