Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Technology
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Figure 8. Sand separator schematic Heinz-Dieter Detzner 1999; used by permission)
Cost
Plant construction costs were ap-
proximately $74 million, with annual
operating expenses of approximately
$22 million. Plant construction costs
included a water treatment plant and
construction of the silt hill.
Technology
Smaller portable plants similar to
the Metha Plant have been con-
Figure 9.
Portable separation system
structed and are operational at many
(Boskalis-Dolman 1999, used
locations. One example is the treat-
by permission)
ment facility run by Boskalis-Dolman
(Figure 9). The plant is designed
20
Chapter 4
Detailed Evaluations

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business