Figure 8. Sand separator schematic Heinz-Dieter Detzner 1999; used by permission)
Cost
Plant construction costs were ap-
proximately $74 million, with annual
operating expenses of approximately
$22 million. Plant construction costs
included a water treatment plant and
construction of the silt hill.
Technology
Smaller portable plants similar to
the Metha Plant have been con-
Figure 9.
Portable separation system
structed and are operational at many
(Boskalis-Dolman 1999, used
locations. One example is the treat-
by permission)
ment facility run by Boskalis-Dolman
(Figure 9). The plant is designed
20
Chapter 4
Detailed Evaluations
|