Page Title: Beach Nourishment Measurement and Payment
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Beach Nourishment Measurement and Payment
Category:
Surveying
This beach nourishment project involved placement of 1,920,000 yd3 of beach fill material
Description:
obtained from the Folly River behind the island, along 8,600 m of shoreline. The project had a
singular construction window in the winter between November 1, 1992 and May 15, 1993.
The template geometry for the beach renourishment was dynamic, rather than static, holding
constant the total number of cubic yards of fill for each linear foot of advance. This approach,
while rendering the final fill quantity more finite and predictable, substantially complicated the
placement of the fill material, and the computation of the pre- and post-dredge surveys.
A unique survey data collection system, the "surfboat," was used to acquire nearshore survey
data. The "surfboat" consisted of a 6-m broad-beam skiff equiped with dual-frequency (24/208)
echo sounder, and Del Norte Microwave positioning system. The unique feature of the surfboat
was the method by which heave was compensated for. A Spectra-physics plane laser was placed
above a point of known elevation, and a height instrument taken from the point to the infrared
light beam. As data were collected, a differential between the bottom of the receiver mast and the
point at which the receiver mast was intersected by the beam was recorded. The differential
measurement, combined with the known distance from the bottom of the mast to the face of the
transducer and the depth measurement, defined the vertical component of the measurement as an
elevation related to the project datum. This feature made additional reduction unnecessary.
Note: Survey boat, valued at $50,000, capsized and sunk during the operation. No one was
injured
Reviewer:
J. Lally
Company / Organization(s):
Projects Completed:
Folly Beach, Beach Nourishment Project
Location:
Folly Beach, South Carolina
Completion Date:
May 1993
Project Cost:
$8,200,000
Estimated Cost:
$5,000
Information Sources:
Literature:
Title:
"Beach Nourishment Project at Folly Beach, SC"
Author:
Billy L. Edge, Patric Johnson, and Charles W. Granger
Month:
5
Year:
1994
LitType:
Report/Proceedings
Publisher:
WEDA XV
Page:
255
38
Chapter 5 Other Technologies Reviewed

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business