Delivering Dredge Slurry Through Long Pipelines
Category:
Operating Procedures
Pipeline/Discharge Systems
Pumps
Description:
The White Rock Lake, Dallas' main water supply, the largest municipal lake in the United States,
will require removal of 2,630,000 yd3 of silt, debris, and vegetation . The contractor, Oscar
Renda Contracting, is using an 18-in. C.S. dredge. Dredge pump is driven by a 1,500-HP DC
motor. The 24-in. steel discharge pipeline is 104,000 ft long with only two booster pumps.
Disposal site is an old quarry.
Reviewer:
C. Woolley
Company / Organization(s):
Projects Completed:
White Rock Lake, City of Dallas
Location:
Dallas, Texas
Completion Date:
1999
Project Cost:
$18,000,000
Comments:
Diluting slurry density reduces power required to pump on extremely long
discharge lines.
Information Sources:
Literature:
Title:
"Dredging Dallas' White Rock Lake"
Author:
Betty Sosnin
Month:
April
Year:
1998
LitType:
Periodical
Publisher:
World Dredging Mining & Construction
Publisher Address:
PO Box 17479 Irvine, California 92623
Publisher Phone:
714 553-0836
47
Chapter 5 Other Technologies Reviewed
|
Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing |