Page Title: Innovative Capping Procedures - Puget Sound Region (Concluded)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Innovative Capping Procedures - Puget Sound Region (Concluded)
Pier 64 Capping Project
Location:
Seattle, WA
Completion Date:
3/94
Beneficial use of Corps maintenance dredge material for the City of
Comments:
Seattle. Seven-compartment barge used to sprinkle uniformly graded sand
(~0.4mm) dredged from upper Duwamish River Navigation Project. A
barge sand spreading system was used. Currents measured real time at
upper 1/3 and lower 1/3 depths.
Simpson Tacoma Kraft Co., Capping and Habitat Restoration Project
Location:
Tacoma, WA
Completion Date:
8/88
COE Permit action. Hydraulically dredged Puyallup River medium sand
Comments:
was used to cap contaminated in situ sediment at pulp mill outfall and
approximately 3,000 yd3 of contaminated excavation for outfall
extension. Spud barge with energy dissipator was used to spread sand.
West Waterway Prototype CAD Project
Location:
Seattle, WA
Completion Date:
3/88
Corps maintenance dredging. 1,100 yd3 bottom dumped into long pit,
Comments:
sprinkled from split-hull barge.
69
Chapter 5 Other Technologies Reviewed