|
|
mixing for 5 min with the laboratory mixer. The slurry should be mixed to a
uniform consistency, with no unmixed agglomerations of sediment.
Figure B-1. Schematic of Effluent Elutriate Test
Table B-1
Recommended Resuspension Factors for Various Ponded Areas
and Depths
Resuspension Factor for Anticipated
Average Ponded Depth
Anticipated Ponded Area
Less than 2 ft
2 ft or Greater
Less than 100 acres
2.0
1.5
Greater than 100 acres
2.5
2.0
B4
Appendix B Column Settling Test and Effluent Elutriate Procedures
|
Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing |