|
|
5-gal glass bottle
Support table for columns
Detergent
Deoxygenated, distilled-deionized (DDI) water conforming to ASTM
Type II (ASTM D1193-99) (ASTM 1999).
D.4.2 Column Preparation Procedure
a. Assemble the Fluid Metering Pump and Dial Indicator Kit according to
manufacturer's instructions.
b. Clean the column parts with a liquid, nonionic, metal-free, detergent
solution, rinse thoroughly with DDI water, and let dry.
c. Screw the nuts onto the bottom of the threaded rods and insert the rods
through the column base plate. Place the base plate in the 3-in.-diam
hole on the table.
d. Using -in. H -in. compression fittings, attach a 2-in. piece of -in.
stainless steel tubing to the inlet of the base plate. (Note: Use -in. H
-in. compression fittings to make all stainless steel/ teflon tubing/ plug
valve/ fluid pump connections.)
e. Connect a stainless steel plug valve to the 2-in. piece of stainless steel
tubing. Use a suitable length of 1/4-in. OD teflon tubing to connect the
plug valve to the outlet side of the Fluid Metering Pump.
f. Attach a suitable length of 1/4-in. OD, teflon tubing to the inlet side of
the pump, and insert the opposite end of this tubing in a 5-gal glass
bottle filled with deaired, DDI water. Securely cover the mouth of the
bottle with parafilm.
g. Open the plug valve, and turn on the fluid pump. When the water level
reaches the grooves inside the base plate, turn off the pump.
h. Place an O-ring inside the base plate making sure the O-ring is properly
seated to avoid water leakage. Place a distribution disk in the base plate.
Place a glass fiber filter on top of the distribution disk. Place the
sediment chamber in the base plate, properly aligning it on top of the
O-ring.
i. On a mechanical mixer, carefully mix the sediment. Mixing under an
oxygen-free atmosphere is recommended.
D15
Appendix D Leachate Testing Procedures
|
Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing |