ERDC TN-DOER-C27
July 2002
Table C1
Alternative 1: Hydraulic Dredging, CDF Disposal, Engineering Costs
Engineering Costs, Alternative 1
Total
tons/
Cost Item
$/ton
$/cy
Tons
yr
Total cy
cy/yr
Total $
$/yr
Hyd Dredging Cost1
$4
0
225,000
112,500
900,000
$450,000
Mech Dredging Cost1
$7
0
0
$0
Mobilization/demobilization
0
0
1,000,000
$500,000
Separation1
$15
0
0
$0
Separation/Dewatering1
$60
0
0
$0
2
Transportation
$110
0
0
$0
Disposal2
$50
0
0
$0
Revenues from sale
1
0
0
0
Total:
0
$1,900,000
$950,000
CDF Construction3
$4
602,165
$2,408,660
Capping
$2
172,888
$345,776
1
Based on in situ volumes or weights.
2
Based on processed volumes or weights.
3
Based on sediment storage volume. Estimated unit costs are based on literature values for similar size CDFs, with upward
adjustments made where freeboard and ponding are required.
Table C2
Alternative 1: Hydraulic Dredging, CDF Disposal, Financial Costs
(Interest Rate = 0.06375)
2001
2002
2003
Cubic Yards
0
112,500
112,500
$/yr
$2,408,660
$950,000
$1,295,776
IDC (interest during construction)
$490,647
$124,986
$82,606
Cost/Year
$2,899,307
$1,074,986
$1,378,382
Total Financial Investment:
$5,352,675
CDF Construction included here if completely precedes dredging.
CDF and first-year dredging included here if they will both occur in the first year.
Includes final-year capping costs.