Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 11. Maximum extent of sediment plume with bucket release rate of 1.5 percent (bottom panel), 2 percent (middle panel),...
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

ERDC TN-DOER-E12
July 2000
Figure 11. Maximum extent of sediment plume with bucket release rate of 1.5 percent (bottom panel),
2 percent (middle panel), and 4 percent (top panel) for Bullock Point Reach South (BPRS) site
over the 3-day simulation time. Plan view shows release point, channel geometry and
maximum concentrations (mg/L) at 10-12 m (33-39 ft) depth. Vertical section shows
distribution of maximum concentrations (mg/L) over depth along dashed section line shown in
plan view. Concentration contours correspond to ranges in the Newcombe-Jensen (1996)
fisheries impact model
15

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business