Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure1. Smoke chart recordi63.98 mi4(2-313a5(the)67.923 s664 4n)-3 -346(se)-344664ent54 41444 ion4 74ipe
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

sticker. Recalibration is required where applicable and as necessary whenever dredging conditions
change in a manner affecting equipment calibration or if the inspector suspects data output to be
inaccurate.
Figure1. Smoke chart recordi63.98 mi4(2-313a5(the)67.923 s664 4n)-3 -346(se)-344664ent54 41444 ion4 74ipe
Louisville District: The Louisville District uses leased hydraulic cutterhead dredges to perform
maintenance dredging on the Ohio River. Like the New Orleans District, smoke charts of suction
and discharge pressures and recordings of pump rpm's were used by the Louisville District, but in
1992, additional dredging parameters and a different data presentation format were added in the
contract specifications. Additional operating parameters required by the new specifications in-
cluded slurry density and velocity in the pipeline, the suction pipe inlet depth, swing cable and

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business