Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 17. Original contaminated mound design for Port Newark/Elizabeth project
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Figure 17.
Original contaminated mound design for Port Newark/Elizabeth
project
Figure 18.
Disposal lanes used for triangular mound placement of contami-
nated material in Port Newark/Elizabeth project
Sound (CLIS) disposal site. This depression was then filled with
over 500,000 m3 of contaminated sediments in 1993/94 from the
dredging of New Haven Harbor. By confining the contaminated
material within the series of mounds from the smaller projects, the
spread of the contaminated material was greatly reduced, requiring
61
Chapter 6 Sediment Dispersion and Mound Development and Site Geometry During Placement