Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: References (Cont.)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Myers, A. C. (1979). "Summer and winter burrows of a Mantis shrimp,
Squilla empusa, in Narragansett Bay, Rhode Island (USA)," Estuarine
Coastal Marine Science 8, 87-98.
Myers, T. E., Averett, D. E., Olin, T. J., Palermo, M. R., Reible, D. D.,
Martin, J. L., and McCutcheon, S. C. (1996). "Estimating contaminant
losses from components of remediation alternatives for contaminated
sediments," EPA 905-R96-001, March 1996, Assessment and Remedia-
tion of Contaminated Sediments (ARCS) Program, U.S. Environmental
Protection Agency, Great Lakes National Program Office, Chicago, IL.
Myers, V. A. (1975). "Storm tide frequencies on the South Carolina coast,"
Technical Report NWS-16, National Weather Service, NOAA, Silver
Spring, MD.
Neal, R. W., Henry, G., and Greene, S. H. (1978). "Evaluation of the sub-
merged discharge of dredged material slurry during pipeline dredged
operations," Technical Report D-78-44, by JBF Scientific Corp. for
U.S. Army Engineer Waterways Experiment Station, Vicksburg, MS.
Nelson, E. E., Vanderheiden, A. L., and Schuldt, D. A. (1994). "Eagle
Harbor Superfund Project." Proceedings of Dredging `94, American
Society of Civil Engineers, New York, 1122-1131.
New York District. (1994). "New York Harbor dredged material manage-
ment plan: Draft Phase I assessment."
Nichols, M. N., Thompson, G. S., and Faas, R. W. (1978). "A field study of
fluid mud dredged material: Its physical nature and dispersal," Tech-
nical Report D-78-40, U.S. Army Engineer Waterways Experiment
Station, Vicksburg, MS.
O'Connor, J. M., and O'Connor, S. G. (1983). "Evaluation of the 1980
capping operations at the experimental Mud Dump site, New York Bight
Apex," Technical Report D-83-3, U.S. Army Engineer Waterways
Experiment Station, Vicksburg, MS.
Palermo, M. R. (1989). "Capping contaminated dredged material in deep
water." Proceedings of the Specialty Conference Ports 89, American
Society of Civil Engineers, Boston, MA.
__________. (1991a). "Design requirements for capping," Dredging
Research Technical Note DRP-5-03, U.S. Army Engineer Waterways
Experiment Station, Vicksburg, MS.
__________. (1991b). "Site selection considerations for capping," Techni-
cal Note DRP-5-04, U.S. Army Engineer Waterways Experiment
Station, Vicksburg, MS.
142
References

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business