|
|
__________. (1991c). "Equipment and placement techniques for capping,"
Technical Note DRP-5-05, U.S. Army Engineer Waterways Experiment
Station, Vicksburg, MS.
Palermo, M. R. (1994). "Placement techniques for capping contaminated
sediments." Proceedings of Dredging `94, The Second International
Conference and Exhibition on Dredging and Dredged Material Place-
ment. American Society of Civil Engineers, Lake Buena Vista, FL.
__________. "Diffuser for submerged discharge of dredge material," Envi-
ronmental Effects of Dredging Programs Technical Note in preparation,
U.S. Army Engineer Waterways Experiment Station, Vicksburg, MS.
Palermo, M. R., et al. (1989). "Evaluation of dredged material disposal
alternatives for U.S. Navy Homeport at Everett, Washington," Technical
Report EL-89-1, U.S. Army Engineer Waterways Experiment Station,
Vicksburg, MS.
Palermo, M. R., Fredette, T. J., and Randall, R. E. (1992). "Monitoring con-
siderations for capping," Dredging Research Technical Notes, DRP-5-
07, U.S. Army Engineer Waterways Experiment Station, Vicksburg, MS.
Palermo, M. R., Maynord, S., Miller, J., and Reible, D. D. (1996). "Guid-
ance for in-situ subaqueous capping of contaminated sediments,"
Environmental Protection Agency, EPA 905-B96-004, Great Lakes
National Program Office, Chicago, IL.
Parker, J. H., and Valente, R. (1988). "Long-term sand cap stability:
New York dredged material disposal site," Contract Report CERC-88-2,
performed by Science Applications International Corporation under
contract to U.S. Army Engineer Waterways Experiment Station,
Vicksburg, MS.
Parry, R. (1994). "Constructing beneficial use dredged material projects."
Proceedings of Dredging `94, ASCE, New York, 547-554.
Parthenaides, E. (1965). "Erosion and deposition of cohesive soils,"
Pearson, T. H. (1987). "Benthic ecology in an accumulating sludge-disposal
site." Oceanic processes and marine pollution; Vol. 1, Biological pro-
cesses and wastes in the ocean. J. M. Capuzzo and D. R. Kester, ed.,
Krieger Publishing, Malabar, FL, 195-200.
Pequegnat, W. E., Gallaway, B. J., and Wright, T. D. (1990). "Revised
procedural guide for designation surveys of ocean dredged material
disposal sites," Technical Report D-90-8, U.S. Army Engineer Water-
ways Experiment Station, Vicksburg, MS.
143
References
|
Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing |